Tel
86-21-58396228
2021 官网升级中!现在您访问官网的浏览器设备分辨率宽度低于1280px请使用高分辨率宽度访问。
Phase III painting line for crane machine and parts
The project is equipped with sand blasting room, priming painting room, priming drying room, floating coat painting room, floating coat drying room,finishing coat painting room,finishing coat drying room, conveyer system, electronic control system, etc
Front channel dry filter cotton adsorption + zeolite wheel + heat storage combustion treatment method for waste gas treatment
Two modes of suspension conveyer system and ground conveyer system with each other to carry out the work piece up and down the line and transport
86-21-58396228
sales@guangchengcoating.com